One of are recent long straw jobs at Ardeley. Photos show removing of a layer of old straw in preparation to install the new straw and some photos of the eve line being set up and then the main coat work in progress.
New Build Thatching Brampton
Plots 13 and 14 are new builds completed in March 2020 and are thatched in Water Reed. The thatching of new builds is not as rare as people think. We normally thatch around 2 new builds a year. This is good for the craft and is always a pleasure to do, as there is no...